DETAILS OF MAJOR PROJECTS EXECUTED |
Client |
M/s. OIL & NATURAL GAS CORPORATION
LTD., MRBC, OBG,
Bandra (E), Mumbai |
| 1. |
Installation of Flow meters on Flare Gas Lines
in Seven Platforms at Mumbai Offshore of ONGC (by
Hot Tapping) (CS -NACE material) |
2. |
TG Exhaust Protection to HVAC at SHQ Platform. |
3. |
Structural Works in Bassein Field along with design,
fabrication & installation. |
4. |
Replacement / Repair of various CU-NI piping and
fittings at BPA and BPB platforms in Bassein Field. |
5. |
One Year Annual contract for Repair of SS/ Cu-Ni/
NACE-CS/ CS Piping, Structures & Valves, Chikson
Replacement, Material Handling and NDT Jobs in Heera
Field. (Contract Period 1999-2000) |
6. |
Revamping of Chemical Injection Skid at HEERA
Platform in Bombay High with imported material.
(TITANIUM Material) |
7. |
Two Year Annual contract for Repair of various
NACE CS, CS, SS & Cu-Ni Piping, Structural works,
Valves/ Chickson Replacement, Material Handling
and NDT jobs at Unmanned/ Process Platforms in NEELAM
and S/LAXMI with materials. (Contract Period 1998-2000) |
8. |
Structural works at offshore platforms in Bassein
Field. |
9. |
Replacement of leaking drain lines at BPA &
BPB Platforms in South Bassein Field. |
10. |
Hook up of 10" Gas Outlet Line of H. P. Separator
to Gas Compressor Suction Manifold at Heera Offshore
Platform. |
11. |
Fabrication of Permanent Flow arms, Booster Pump
Recirculation Line and Deck Extension for various
Platforms at Heera Field. |
12. |
One Year Annual contract for Repair of SS/ Cu-Ni/
NACE-CS/ CS Piping, Structures & Valves, Chikson
Replacement, Material Handling and NDT Jobs in Heera
Field. Contract Period 2000- 2001) |
13. |
Repair of LLP Flare Line of NACE CS material of
BPA Platform in Bassein Field |
14. |
Connection of HT Risers (12", 2 Nos.) to
production headers (20", 2 Nos.) and supply
of materials. |
15. |
Hiring of Inert Gas Generator along with services
to be deployed at BCP-A Platform. One year Annual
Contract. (2001-2002)
*** Sub Contractor to M/s. EPIL.
|
16. |
Removal of two nos. of Turbo-Generators (TG's)
from Heera Platform. |
17. |
Fabrication and Installation of Liquid Seal in
HP Flare at HRG & LP Flare at HRA and Interconnection
of HP Flare with LP Flare at HRA. |
18. |
Fabrication, Installation, Hook-up & Commissioning
of Ejectors at SHD & SHP Platforms on Turnkey
Basis. |
19. |
Removal of Equipments, Reinforcements of B - 55
Gas Flare Header Supports and Liquidation of Lloyd's
Points. |
20. |
Revamping of Deck Drain at HA & HRA platform
on Heera Process complex and Replacement of suction
and discharge Lines of Booster pumps at Heera Process
complex. |
21. |
Structural Repair and Air Scour Piping Job at
WIS Fine Filter Package on Turnkey Basis. |
22. |
Manufacture, Supply, Installation and Commissioning
of Sea Water Strainer Housing at BPB Platform. |
23. |
Modification for Alternative Scheme for Well-Fluid
Processing at Heera Platform. |
24. |
Supply and Replacement of Potable water pipelines
& fittings at Sagar Laxmi Platform. |
25. |
Miscellaneous Repair Works for Heera Field (03
Months) |
26.
|
Fabrication & Installation of Handrails, Gratings,
Chequered plates and Misc. Structural works at Offshore
Platforms in Bassein Field. |
27. |
Shutdown related Jobs at Neelam Process Complex. |
28. |
Repair/Modification of H P Separator at Neelam
Platform. |
29 |
Supply, Fabrication, Installation & Commissioning
of Ejector System at NQO. |
30 |
Fabrication/Installation of Piping, Installation
of Valves, replacement of compressors internals,
replacement of vessel internals for PGC up gradation
at Neelam Platform. |
31 |
Re construction jobs at MNW Platform. |
32 |
Repair / Maintenance jobs of urgent nature and
related to process & process piping at Bassein
platforms. |
33. |
Rate Contract for Carrying out Various jobs at
Un-Manned & Process Platforms of Neelam &
Sagar Laxmi. (03 Years Contract) |
34. |
Installation of 'U' Type Liquid Seal and Ejector System at NQO. |
|
|
Client : |
M/s. KVAERNER PROCESS SYSTEMS
LTD.
United Kingdom
|
1. |
Fabrication of Fuel Gas Conditioning Skids piping, installation of FG Skid Package System at
BHN Offshore Platform. |
|
|
Client : |
M/s. BELLS CONTROLS LIMITED
Mumbai |
1. |
Installation of FM 200 Extinguishing System at
Bombay High 'F' Platform. |
|
|
Client : |
M/s. INDIAN RAYON & INDUSTRIES LTD.
Veraval, Gujarat. |
1. |
Annual Rate contract for welding of various exotic
materials. |
|
|
Client : |
M/s. VIKRAM ISPAT (A UNIT OF GRASIM INDUSTRIES)
Revadanda, Dist. Raigad, Maharashtra |
1. |
Replacement of Process Gas Heater Tubes during
shutdown period in 1997-98.
[HP-40 materail]. |
2. |
Replacement of Steam Superheater Coils . (SS -316 material) |
3. |
Duct Modifications & Installation of Diverter
Valve during December- 97 Shutdown Period. (Incolloy -800 material)
|
4. |
Annual Rate Contract for Replacement of Process Gas Heater Tubes during shutdown periods from 01.01.1999 till 31.09.2001. (HP-40 material) |
5. |
Replacement & Welding of Reducers of Process
Gas Heater (PGH), Reformer tubes, Convection tubes,
HDS pre heater job etc. during August/ September- 01 Major Plant Shutdown |
6. |
Replacement of PGH tubes & fittings, Reformer
tubes, PGH Reducers in September - 02 Shutdown. |
7. |
Replacement of PGH reducers , Reformer Tubes& Replacement of PGH tubes & Fittings in September- 03 Shutdown. |
8. |
Replacement of PGH tubes & Fittings & Replacement of 2nd Convection Tube, Fabrication of 6” Reactor Cluster breaker in April - 04 Shutdown. |
9. |
Replacement of Reformer Tubes & Replacement of PGH tubes & Fittings Replacement of Reformer Outlet Pigtails in September- 04 Shutdown. |
10. |
Replacement Reformer Tubes, Reformer Outlet Pigtails,
PGH Convection & Radiant Tubes/Fittings during
October- 05 Shutdown. |
11. |
Fabrication of PGH Convection Tubes |
|
|
Client : |
M/s. DEEPAK FERTILIZERS & PETROCHEMICAL CORPORATION.
LTD.
Taloja, Dist. Raigad, Maharastra. |
1.
|
Replacement of Expander Gas Heater Flange at WNA
Plant. Labour charges with consumables tools &
tackles. (SS 316 L material) |
2. |
Plugging of Tubes of Cooler Condenser E-210. Labour
charges with consumables tools & tackles. (Zirconium material) |
3. |
Welding of MS Core Rods with SS 304 Wire with
material |
4. |
Fabrication & Welding of Miter Bends and Reducer
for CNA Plant. Labour charges with consumables tools
& tackles. (SS 304 L Material) |
5. |
Repair of Heat Shield Cone of Expander Gas Heater.
Labour charges with consumables tools & tackles.
(Inconnel -800 Material) |
|
|
Client |
M/s. S V C SUPERCHEM LTD.
Chhata, Dist. Mathura, U. P. |
1. |
Fabrication and Supply of Titanium Impellers for PTA Plant Agitators with
material [Titanium material]. |
2. |
Development of Spares for Bottom Bearing Agitators with material.
(Carbon filled Teflon material). |
|
|
Client |
M/s. NIKO RESOURCES LTD.
Baroda, Gujarat. |
1. |
Fabrication of Intake Header and Outlet Manifold with material. |
2. |
Up gradation of LBDP & Gas Plant.
|
|
|
Client : |
M/s. BG EXPLORATION & PRODUCTION INDIA LIMITED.
Mumbai. |
1. |
Assorted Construction Jobs at PA, PB, PC, PD,
PE, PF, PG, PQ and MA Platform |
2. |
Fabrication and Installation of 8" Sea Water
Line Header from PQ to PPA and 18" NACE CS
Well Fluid bypass Spools at PPA |
3. |
Extension of PQ Cellar Deck Lay down Area &
PA Wellhead Access Platform in Panna Field |
4. |
Fabrication and installation of PA#9 gas lift
line, flow arms at PB & PE, Deluge valve and
few miscellaneous job in Panna Field |
5. |
Construction Support for installation of Escape
Capsule at PPA platform in Panna Mukta Field |
6. |
Repair of corroded risers at STA and STC platforms
in Tapti Field |
7. |
Miscellaneous Construction Jobs in Panna &
Muktha Platform during platform shutdown. |
8. |
Fabrication and installation of fenders on boat
landings in Panna & Tapti fields |
9. |
Fabrication of Underwater Clamps for Tapti. |
10. |
Replacement of LQ Flush Line & Repair of Valves
on PQ Platform |
11. |
Fabrication of Riser Clamp for Panna Process Platform |
12. |
Miscellaneous Construction Jobs in Panna Field. |
13. |
Fabrication and installation of supports and fenders on the boat landings in Panna & Tapti
fields |
14. |
Fabrication and installation of Flow arm lines of 4” sizes at Tapti Field. |
15. |
Fabrication and hookup of Flowarms at PC &
PD |
16. |
Fabrication and hookup of Gas lift line at PANNA |
17. |
Fabrication and hookup of ATF line at PANNA |
18. |
Fabrication & Installation of miscellaneous piping jobs at STB/STC in Tapti Field. |
19. |
Fabrication & errection of Flow arms at Panna . |
20. |
Fabrication Services for DE-09 Reduction of Rebioler
Back Pressure at TPP Platform |
21. |
Shut Down Services at PPA Platform in Panna Field |
22. |
Shutdown Services at Panna-Mukta Offshore Fields (Nov- 05) |
23. |
Panna Capacity Enhancement Project (PCE)- Shutdown Related Jobs (May- 06) |
24. |
Shutdown Services at Panna-Mukta Offshore Fields (May- 06) |
25. |
Prefabrication and Installation of Gas Lift Lines at PC and PG in Panna Field. |
26. |
Prefabrication and Installation of Gas Lift Lines at PE and PF in Panna Field. |
27. |
Fabrication and Erection of Flow arm Piping at STD platform. |
28. |
Fabrication & Installation of Riser Guard at TPP platform. |
29. |
Fabrication, Transportation and Installation of Clamp-on structures on PB & PF Platforms. |
30. |
Upgradtion of TPP-LQ for NRPOD Project. |
31. |
Deputation of Manpower onboard PANNA, MUKTA, & TAPTI Offshore Platforms of M/s BGEPIL for Miscellaneous Construction jobs. |
32. |
Gas Lift lines in PA, PD, PE, PF Platforms. |
|
|
|
|
Client : |
M/s HYUNDAI HEAVY INDUSTRIES CO.LTD.
Mumbai |
1. |
Repair / Replacement, Fabrication, Welding, Installation
and NDT of SDSS Fire Water Lines and DSS HP Compressor
at BCP-B Platform. |
2. |
Fabrication, Erection, Supply of Winch, Materials,
Personnel and other Equipment for Removal &
Installation of East side Crane Engine at BCP-A
Platform. |
|
|
Client : |
M/s. OCEANEERING INTERNATIONAL
Mumbai Office [ Sub- Contractor to EIL/L&T ] |
1. |
Supply, Fabrication, & Installation of Well
Head Access Platform, Hot and Cold Insulation work
on well fluid lines and Instrumentation works at
SA & SI Platform in South Field under CRMP-
II PROJECT. |
|
|
Client : |
M/s. SPIC - SMO LTD.
Navi Mumbai
|
1. |
Fabrication, Erection and Commissioning of 9 Well
Flow Arms [ DSS material ] at BA Platform of ONGC
Offshore. |
2. |
Fabrication, Supply, Installation & Commissioning
of HC Sump Tank to ONGC BPB Platform. |
3. |
Fabrication and Erection Gas Test Separator Piping
(DSS material) at BC Platform of ONGC Offshore. |
|
|
Client : |
NATIONAL AEROSPACE LABORATORIES,
Bangalore |
1. |
Piping and Erection of Mechanicals Equipments
for IFRF Projects |
|
|
Client : |
M/s. ALFA OVERSEAS,
Mumbai. |
1. |
Removal & Installation of Tube Bundles of
Test Cooler at BPA Platform. |
|
|
Client : |
M/s. VEECON - I P A GASTECHNIK LTD.
New Delhi |
1. |
Refurbishment of PSA based Inert Gas Generator
of BPA Platform. |
|
|
Client : |
M/s. ENGINEER INDIA LIMITED
New Delhi |
1. |
Supply of Chemical Storage & Dosing System
for D1 Well-cum-Water Injection Platform Project
of ONGC. |
|
|
Client : |
M/s. VECO ENGINEERING LIMITED.
Mumbai |
1. |
Installation of Pig Barrels at 6 Platforms
in South Field of ONGC. |
|
|
Client : |
BHARAT HEAVY ELECTRICALS LIMITED
Mumbai |
1. |
Revamping of Chemical Injection System at WIS
& SHW Offshore Platform of ONGC Ltd. |
|
|
Client : |
M/s. GMMCO LTD.
Mumbai |
1. |
Replacement of Firewater Pump Engine at SHG. |
|
|
Client : |
HINDUSTAN SHIPYARD LIMITED
Visakhapatanam |
1. |
Offshore Installation of GRE Piping at ICP, SCA,
SA, BHN & NQO Platforms of ONGC Ltd. |
|
|
Client : |
M/s. INDICON PROJECTS & EQPT.LTD.
Mumbai |
1. |
Replacement of Flare Knock Out Drum at NA Platform
of ONGC Ltd. |
|
|
Client : |
M/s. RELIANCE INDUSTRIES LTD.
Navi Mumbai |
1. |
Fabrication and Installation of Launch Frame for
Standby R O V MAGNUM 88 Base Skid |
2. |
Design, Fabrication and Supply of MUDMAT on turnkey
basis. |
3. |
Design, Fabrication, Load testing and Supply of
45ft & 67ft offshore Cargo
Carrying Units.
|
|
|
Client : |
M/s. SIME DARBY ENGINEERING SDN. BHD.
Malaysia. |
1. |
D1 Water Injection Platform Topside modifications. |
|
|
Client : |
M/s. CLOUGH PROJECTS INTERNATIONAL PTY LTD,
Australia |
1. |
Riser Clamp Fabrication for EPOD Project of BGEPIL. |
2. |
Fabrication and Welding of Stanchions. |
3. |
Hanger Flange Fabrication. |
|
|
Client : |
M/s. TRANSOCEAN INC
Mumbai. |
1. |
Deck Strengthening & Main Deck Extension for
IWO ROV A - Frame & Winch at DWF Rig Kakinada. |
2. |
Fabrication, Welding & Installation of Deck
Extended Hose Hanger at DWF Rig. |
3. |
Fabrication, Welding & Installation of Structural I.W.O. Warehouse Extension in DWF Rig. |
4. |
Deputation of Manpower for DWF Rig |
|
|
Client : |
M/s. GREAT OFFSHORE,
Mumbai |
1. |
Installation of Walkways at Jetty Head for LNG
Terminal Project of RGPPL. |
|
|
Client : |
M/s. DEEP WATER SERVICES (INDIA) LIMITED. |
1. |
Revamping of Free Gas Module at SHG Platform for
handling Condensate. |
|
|
Client : |
M/s.HAL OFFSHORE LIMITED, Mumbai |
1. |
Replacement of IUG Skid at 13 Platforms in Mumbai
High Platforms of ONGCL. |
|
|
Client : |
M/s. ENSCO Maritime Ltd
Mumbai |
1. |
Deputation of Fitters, Welders, Scaffolders & NDT technicians with Equipments onboard ENSCO-50 for welding of high Pressure Lines. |
| |
|